Calculation of the costs recoupment
Rough efficiency of DC electric arc furnaces with the capacity from 1,5 up to 6,0t in comparison with similar AC electric furnaces
Name |
ДСПТ-1,5 |
ДСПТ-3 |
ДСПТ-6 |
||||||||||||||||||||
1. Annual design capacity, t/year |
5000…7000 |
10000…15000 |
25000…30000 |
||||||||||||||||||||
|
|
|
|
||||||||||||||||||||
3. Additional expenditure pay-back period, year |
1,0…1,5 |
0,9…1,0 |
0,6…0,7 |
Rough efficiency of DC electric arc furnaces with the capacity from 12 up to 25t in comparison with similar AC electric furnaces
Name |
ДСПТ-12 |
ДСПТ-25 |
|||||
1. Annual design capacity, t/year |
40000…50000 |
80000…90000 |
|||||
|
|
|
|||||
3. Additional expenditure pay-back period, year |
0,7…1,0 |
0,6…1,0 |
Notes:
1. Economic benefit is mentioned during ordinary steel melting. During alloyed steel melting economic benefit increases in 1,2 … 1,5 times (pay-back period accordingly decreases).
2. Economy does not include:
a) benefit of the expensive alloying components loss reduction;
b) gas purification and nature protection actions costs reduction;
c) electric equipment, cable production, etc resource increasing;
d) lining and repair works costs reduction;
e) smelted metal qualities improving.
The term of the costs recoupment is from 6 up to 12 months.