UkrNIIElectroterm and Thermo-Engineering design and manufacture modern secondary metallurgy units – ladle- furnaces (LF) with the capacity of 6 to 50 tons.

In general, steel processing in the ladle can be carried out in the following steps: homogenization of metal temperature and chemical composition, correction of the steel chemical composition by using of appropriate additives, removing of harmful impurities (sulfur, hydrogen, nitrogen and sometimes carbon , etc.), bringing of the metal temperature to the regulated value, steel refining by non-metallic inclusions removal, production of steel with constant properties from tap to tap, control of the slag composition, etc.

LF are equipped with such systems:

  • System for the measurement of the metal level in the ladle, slag and metal temperature, oxygen activity and sampling of metal and slag;
  • System for the gas mode control during argon blowing of the metal through the bottom plug or through the top (emergency) lance;
  • Mechanism (arm) for feeding and vertical movement of the emergency lance;
  • Submersible removable refractory lances for argon blowing of the metal or powdery material supply in a stream of argon; container for the lances installation;
  • Controller-positioner of blowing lances (the device that allows to turn a container with lances to a certain angle for taking the lance and installing it using the lifting, turning and lowering mechanism);
  • Pinch roll for automatic feeding of metal and flux-cored wires into the melt;
  • Water-cooled charging chute connected by the inclined charging chute with the conveyor of the bin trestle, and with the system for weighing and feeding into the bucket of lump slag-forming, deoxidizing and alloying materials.

Specifications of the LF model range:


Parameter name

АКП-12

АКП-30

АКП-50

Ladle rated capacity, ton

12

30-40

40-50

Melt heating rate, °С/min

3-5

3-5

3-5

Furnace transformer power, MVA

5

10

13

Graphitized electrode diameter, mm

250

300

300

Electrodes circle diameter, mm

500

600

600

Ladle treatment time, min

35-40

35-40

35-40